Transperth, a division of the Western Australia Public Transport Authority (PTA), has announced it will conduct a 12-month trial, starting early in 2012, of a system to allow their contracted bus operators to better manage and deliver services.
The pilot is part of a significant redevelopment project in the Perth Central Business District (CBD) which is aimed at improving linkages and reconnecting the city centre with Northbridge, one of Perth's major cultural and entertainment precincts. The aim is to remove the existing physical barrier created by the ‘at grade’ Fremantle Train Line and replace it with a below ground rail line. A key component of the public transport works includes the construction of a new underground bus station that will both significantly reduce the facility's footprint and maximise the number of available bus stands, passenger amenities and terminal efficiency. Real-time vehicle tracking and management on the bus network is critical to the new bus station's successful operation, and will provide effective station traffic control and dynamic stand allocation functions.