Skip to main content

Bombardier deploys new rail control solution in Kuala Lumpur

Bombardier Transportation’s fully-automated CITYFLO 650 rail control solution has entered service on second phase of new Klang Valley Mass Rapid Transit (KVMRT) Line 1 in Kuala Lumpur. Bombardier is equipping over 100 km of the KVMRT network with the technology, which offers operators optimised network capacity and heightened responsive traffic management. The system, which features a centralised control centre system and advanced radio-based communications, has been achieving high levels of availability si
July 26, 2017 Read time: 1 min
513 Bombardier Transportation’s fully-automated CITYFLO 650 rail control solution has entered service on second phase of new Klang Valley Mass Rapid Transit (KVMRT) Line 1 in Kuala Lumpur.

Bombardier is equipping over 100 km of the KVMRT network with the technology, which offers operators optimised network capacity and heightened responsive traffic management.

The system, which features a centralised control centre system and advanced radio-based communications, has been achieving high levels of availability since phase 1 opened in December 2016. Driverless trains operate with a peak-time frequency of less than three and a half-minute intervals and at speeds of just under 100 km/h. The new line offers a time-efficient and comfortable journey for passengers to cross the city within 90 minutes.

For more information on companies in this article

Related Content

boombox1
boombox2