The long-established 3902 Balfour Beatty 5176 VINCI joint venture is to be awarded two rail contracts in the UK by High Speed 2 (HS2), worth a combined total of around US$3.3 billion (£2.5 billion).
Balfour Beatty VINCI will deliver Lots N1 and N2between the Long Itchington Wood Green tunnel to the
Main construction work is scheduled to start in 2018/19, following a period of detailed design work.